If you are planning to do an alteration within your apartment that will affect any plumbing, electrical or structural areas of the building (i.e. moving walls, etc.) please download and complete this application. You may submit this to your building Manager, Mark Levine. If you need to obtain a NYC Department of Buildings Work Permit, you will need to fill out the PW-1 form below which will need to be signed by both the Board of Directors and the Shareholder.
EPA Lead Paint Certification: Please note that if you are planning to paint greater than six square feet or will be doing any demolition work at all you will need to hire an EPA Lead Safe Certified Contractor to do the work. Since your building is pre-1978, new EPA Federal Regulations are in place requiring that your contractor be a certified renovator from a certified firm. Proof of Certification for both the renovator and the firm will be required in order for your application to be approved. For more information please see www.epa.gov/lead.
If you are doing non-invasive work, which includes painting, tile work, cabinet replacement, cosmetic work or any other work which will not touch any of the building systems, please go to the “Decorating Application” page on this site.
